PERHAPS A GIFT VOUCHER FOR MUM?: MOTHER'S DAY

Close Notification

Your cart does not contain any items

Project Execution of Mega-Projects for the Oil and Gas Industries

Soosaiya Anthreas

$96.99

Paperback

Not in-store but you can order this
How long will it take?

QTY:

English
CRC Press
25 September 2023
This book covers execution of mega industrial projects especially in oil and gas industries covering engineering, procurement, construction, commissioning and performance testing. It enumerates various tasks and deliverables under each discipline and sub-disciplines to define the detailed scope of work, supplies and services, as per level III of Prima Vera Schedule developed from the contract-based schedule. It gives an overall idea of how a project rolls out from commencement date to initial acceptance and executed practically with total contractor’s scope of work broken down into tasks/activities at level III platform, while highlighting that support for fool proof project execution.

By:  
Imprint:   CRC Press
Country of Publication:   United Kingdom
Dimensions:   Height: 234mm,  Width: 156mm, 
Weight:   380g
ISBN:   9780367675264
ISBN 10:   0367675269
Pages:   208
Publication Date:  
Audience:   Professional and scholarly ,  Undergraduate
Format:   Paperback
Publisher's Status:   Active
SECTION I PLANNING AND EXECUTION IN LEVEL 3. 1. Management, Control and Administration. 2. HSE, Social and Security. 3. Services and Facilities to Owner. 4. Engineering. 5. Procurement and Supply. 6. Transport, Logistic and Storage. 7. Construction. 8. Pre-Commissioning. 9. Commissioning, Start-up and Performance Test. 10. Temporary Facilities. SECTION II COMMERCIAL ASPECTS. 11. Commencement Date and Effective Dates. 12. Extension of Time. 13. Professionally Handling Large Claims. 14. Prolongation and Disruption Costs. 15. Penalty/Interest for Payment Delays. 16. Force Majeure. 17. Concurrent Delays. 18. Hedging against Currency Fluctuations. 19. Indemnity. 20. Consequential, Indirect Damages. 21. Laws and Regulations. 22. Escalation. 23. Liens. 24. Total Liability. 25. Payment Terms. 26. Planning. 27. Progress Measurement. 28. EOT claim. 29. Interpretation Rules. 30. Change/Variations/Trend Notices. 31. Contract Price below Floor Price and Consequences. 32. Owner’s Delay on Document Approval. 33. Insurances. SECTION III TECHNICAL ASPECTS. 34. Life Cycle Cost Analysis (LCCA). 35. Consequences of Delayed Rigless Test on Wells (Owner Delays). 36. Strategy for using Non-Spec Feedstock for Commissioning. 37. Gas In and Authority Check points. 38. Value Engineering. 39. Design Defect, Construction Defect and Damages. 40. NDT (Non-Destructive Testing). 41. Destructive Testing. 42. Hydrostatic Leak Test. 43. Heavy Lift Load Sharing for Cranes. SECTION IV GLOSSARY OF ABBREVIATIONS, NAMES AND MEANING. APPENDIX. 1. Project Organization. 2. Contract Price Weight Factor. 3. Monthly Status Report Contents. 4. Material Requisition Cycle(MR). 5. FEED Deliverable List. 6. Process Block Flow Diagram. 7. Document Categories. 8. Claims and Liens Release Letter. 9. Prolongation and Disruption Cost: Hudson formula. 10. A typical list of Procedures and Plans. 11. Total Plant Break down into Areas.

Soosaiya Anthreas graduated from CIT in Mechanical Engineering. He has thirty four years of experience from mega industrial projects in the field of project development, project management and project construction. He worked in global EPC companies like Samsung Engineering and Technip FMC. As a weekend novelist, he published his first literary fiction novel, The Dance of the Sea. He lives in Chennai with wife and son..

See Also