LATEST DISCOUNTS & SALES: PROMOTIONS

Close Notification

Your cart does not contain any items

Construction Scheduling, Cost Optimization and Management

Hojjat Adeli Asim Karim

$399

Hardback

Not in-store but you can order this
How long will it take?

QTY:

English
CRC Press
25 January 2001
In an increasingly competitive environment, construction professionals must ensure that efficient schedules

are kept and that costs are kept to a minimum. Presenting a

groundbreaking new construction scheduling model, CONSCOM, this book provides the solution to effective construction scheduling and cost optimization. Cost Scheduling, Cost Optimization and Management presents a general mathematical formulation for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can

be modelled. The authors show that for any given construction duration, the CONSCOM model automatically yields the optimum construction schedule for minimum construction cost. By varying the construction duration, readers are shown how to solve the cost-duration trade-off construction cost. The model provides features desirable for repetitive projects such as highway construction and allows schedulers greater flexibility. It is particularly suitable for studying the effects of change on the construction cost. This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

By:   ,
Imprint:   CRC Press
Country of Publication:   United Kingdom
Dimensions:   Height: 234mm,  Width: 156mm,  Spine: 25mm
Weight:   703g
ISBN:   9780415244176
ISBN 10:   041524417X
Pages:   338
Publication Date:  
Audience:   College/higher education ,  Professional and scholarly ,  Primary ,  Undergraduate
Format:   Hardback
Publisher's Status:   Active

Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.

Reviews for Construction Scheduling, Cost Optimization and Management

'Here is a practical guide for those involved in the construction industry, including engineers, contractors, and project managers.'-Business Review May-June 2002


See Also